The article deals with the use of precast concrete parts in high-rise buildings. For cost reasons, a short construction period is required, which in the past was achieved by optimizing and automating the in situ concrete formwork technology. The prefabricated construction method gives us the opportunity to further shorten the construction time. It also reduces the use of personnel and materials on the construction site and thus simplifies production. The report also reports on the use of precast concrete elements for columns, slabs and walls in the FOUR high-rise project in Frankfurt a.M. In addition to economic aspects, the execution and static details are discussed.
«
The article deals with the use of precast concrete parts in high-rise buildings. For cost reasons, a short construction period is required, which in the past was achieved by optimizing and automating the in situ concrete formwork technology. The prefabricated construction method gives us the opportunity to further shorten the construction time. It also reduces the use of personnel and materials on the construction site and thus simplifies production. The report also reports on the use of precast...
»