User: Guest  Login
Title:

First monitoring and analysis of the manufacturing and installation process of timber based 2D modules for accomplishing a future robotic building envelope upgrading

Document type:
Konferenzbeitrag
Contribution type:
Textbeitrag / Aufsatz
Author(s):
Kepa Iturralde, Thomas Linner, Thomas Bock
Pages contribution:
65-73
Abstract:
The BERTIM Research Project is funded by the European Commission in order to develop a system for an efficient building envelope upgrading. The main goal of this envelope upgrading consists on adding a new 2D or 3D module onto the building external layer. The modules are made out of timber, thermal insulation and waterproof layers. These modules can also host some functionalities. In a previous phase, a method for implementing an efficient, integrated, modular and customized manufacturing and in...     »
Keywords:
refurbishing, customization, automated, prefabrication, Axiomatic Design, TRIZ
Horizon 2020:
636984
Editor:
International Association for Automation and Robotics in Construction (IAARC)
Book / Congress title:
Proceedings of the 34rd ISARC (International Symposium on Automation and Robotics in Construction)
Date of congress:
28.06 - 01.07.2017
Year:
2017
Pages:
1106
E-ISBN:
978-80-263-1371-7
Reviewed:
ja
Language:
en
Publication format:
WWW
Fulltext / DOI:
doi:10.22260/ISARC2017/0009
WWW:
http://www.iaarc.org/publications/search.php?publication=38
TUM Institution:
Lehrstuhl für Baurealisierung und Baurobotik
Format:
Text
 BibTeX