Kepa Iturralde, Thomas Linner, Thomas BockFirst monitoring and analysis of the manufacturing and installation process of timber based 2D modules for accomplishing a future robotic building envelope upgrading65-73Proceedings of the 34rd ISARC (International Symposium on Automation and Robotics in Construction)2017
Natalia Lasarte, Jose Antonio Chica, Ignacio Gomis, Josu Benito, Kepa Iturralde, Thomas BockPrefabricated Solutions and Automated and Digital Tools for the optimisation of a Holistic Energy Refurbishment Process125-140Proceeding of the 8th European Congress on Energy Efficiency and Sustainability in Architecture and Planning and 1st International Congress on Advanced Construction2017
Wen Pan, Katharina Langosch, Thomas BockDevelopment of the Process Information Modelling in the construction project: A case study of the ZERO-PLUS project775-7822017 Proceedings of the 34rd ISARC, Taipei, Taiwan2017