Benutzer: Gast  Login
Titel:

Sustainable High-Speed Railway Bridge Construction over the Danube-Tisa-Danube Canal

Dokumenttyp:
Konferenzbeitrag
Art des Konferenzbeitrags:
Textbeitrag / Aufsatz
Autor(en):
Čučković, Milena; Dašić, Branislav; Stipanić, Bratislav
Seitenangaben Beitrag:
319-330
Kapitel Beitrag:
29
Abstract:
As part of the project ``Modernization, reconstruction, and construction of the railway Belgrade - Subotica state border (Kelebija),'' a bridge designed for speeds of up to 200 km/h was constructed over the Danube-Tisa-Danube canal. The bridge, a two-track structure, features a truss continuous support on three spans totaling 154 meters (42+56+56). In the plan view, the bridge appears straight with straight abutments and skewed middle piers. The height between the top and bottom chord measures 9...     »
Dewey-Dezimalklassifikation:
620 Ingenieurwissenschaften
Kongress- / Buchtitel:
Proceedings of the 11th International Conference on Bridges in Danube Basin
Ausrichter der Konferenz:
Förderverein Massivbau der TU München e.V.
Datum der Konferenz:
21.11.2024
Publikationsdatum:
21.11.2024
Jahr:
2024
Quartal:
4. Quartal
Jahr / Monat:
2024-11
Monat:
Nov
Reviewed:
ja
Erscheinungsform:
WWW
Volltext / DOI:
doi:10.14459/icbdb24.29
 BibTeX