User: Guest  Login
Author(s):
Zhang, S.
Title:
Model-based construction process simulation on a BIM example project
Abstract:
This Master Thesis brings an insight into the application of Building Information Mode-ling (BIM), especially 4D-method, in infrastructure construction projects. 4D-method represents the linking of construction time information to the existing 3D-model, which contributes a model-based construction simulation that will optimize the construction schedule in the early design phase and bring benefits to the construction phase. The process of 4D-method, especially three specific ways of linking, will...     »
Keywords:
LOCenter; BIM;
Subject:
ALL Allgemeines
Supervisor:
Borrmann, A.; Vilgertshofer, S.
Year:
2022
Year / month:
2022-08
Month:
Aug
University:
Technische Universität München
 BibTeX