- Title:
Design and Optimization of the 8.800 m long Bossler Tunnel for the Highspeed Railway Line Stuttgart - Ulm
- Document type:
- Konferenzbeitrag
- Author(s):
- Behnen, G.; Boley, C.; Fischer, O.; Meier, C.; Nevrly, T.; Müller, J.
- Book / Congress title:
- World Tunnel Congress (WTC) 2017
- Congress (additional information):
- Surface challenges - Underground solutions
- Year:
- 2017
- Year / month:
- 2017-05
- Reviewed:
- ja
- BibTeX