Benutzer: Gast  Login
Dokumenttyp:
Report / Forschungsbericht
Autor(en):
Linner, T., Güttler, J., Iturralde, K.
Titel:
Method for implementing an efficient, integrated, modular and customized manufacturing and installation process of the BERTIM modules
Titelzusatz:
Deliverable 2.5
Abstract:
This Deliverable 2.5 is the output of the development achieved on Task 2.5 within the Work- Package 2 of the BERTIM Research Project. Prior to the Task 2.5, it has been found that the manufacture-installation of prefabricated modules for the refurbishment market needs to be lifted to a more integrated, systemized and automated level, in order to transform the existing buildings stock towards near zero energy consumption at reasonable cost. In building renovation, prefabricated modules have to be...     »
Projekt:
BERTIM – Building Energy Renovation through Timber
Horizon 2020:
636984
Beauftragende Einrichtung:
Public Deliverable submitted as part of the EU H2020 research project BERTIM (Grant Agreement No. 636984).
Jahr:
2015
Sprache:
en
WWW:
www.bertim.eu
 BibTeX