This Deliverable 2.5 is the output of the development achieved on Task 2.5 within the Work- Package 2 of the BERTIM Research Project. Prior to the Task 2.5, it has been found that the manufacture-installation of prefabricated modules for the refurbishment market needs to be lifted to a more integrated, systemized and automated level, in order to transform the existing buildings stock towards near zero energy consumption at reasonable cost. In building renovation, prefabricated modules have to be industrially customized to each building, and therefore, standard prefabrication and refurbishing approaches have to be re-conceived. In that sense, the automotive industry is a good example of combining modular products and manufacturing processes. In this research project, the goal of a dedicated Task 2.5 is to ameliorate the existing holistic renovation process, by a combination of an integration of robotic, automation and augmented reality technologies.
«
This Deliverable 2.5 is the output of the development achieved on Task 2.5 within the Work- Package 2 of the BERTIM Research Project. Prior to the Task 2.5, it has been found that the manufacture-installation of prefabricated modules for the refurbishment market needs to be lifted to a more integrated, systemized and automated level, in order to transform the existing buildings stock towards near zero energy consumption at reasonable cost. In building renovation, prefabricated modules have to be...
»