Cross-passage opening in TBM tunnels – concepts, load-bearing behaviour and experimental investigations
Proceedings of the World Tunnel Congress (WTC) 2017 – Surface challenges – Underground solutions
2017
Design and Optimization of the 8.800 m long Bossler Tunnel for the Highspeed Railway Line Stuttgart – Ulm
Proceedings of the World Tunnel Congress (WTC) 2017 – Surface challenges – Underground solutions
2017
Stuttgart 21 NBS Wendlingen-Ulm: Der 8.800 m lange Boßlertunnel im Zuge des Albaufstiegs
Tagungsband Fachsektionstage Geotechnik – Interdisziplinäres Forum der Deutschen Gesellschaft für Geotechnik e.V. DGGT
2017
Cross-passage opening in TBM tunnels - concepts, load-bearing behaviour and experimental investigations
World Tunnel Congress (WTC) 2017
2017
Design and Optimization of the 8.800 m long Bossler Tunnel for the Highspeed Railway Line Stuttgart - Ulm
World Tunnel Congress (WTC) 2017
Surface challenges - Underground solutions
2017
Scheibenbemessung der Pressenkraftdurchleitung bei TVM-Vortrieben
Beton- und Stahlbetonbau
2016
111
Nov
694 - 705
Besondere Fragestellungen und Innovationen im Tunnelbau am Beispiel des Boßlertunnels / Albaufstieg (NBS Wendlingen – Ulm)
57-68
5. Münchener Tunnelbausymposium
2016
Untersuchungen zum Trageverhalten der Verbundfuge von Spritzbetonergänzungen - allgemeine Erkenntnisse und Ausblicke für die einschalige Spritzbetonbauweise im Tunnelbau
Spritzbeton-Tagung 2015
2015
Fertigteile im Tunnelbau
235 - 302
BetonKalender 2014
Bergmeister, K.; Fingerloos, F.;
Ernst und Sohn
2014