Design and Optimization of the 8.800 m long Bossler Tunnel for the Highspeed Railway Line Stuttgart – Ulm
Proceedings of the World Tunnel Congress (WTC) 2017 – Surface challenges – Underground solutions
2017
Design and Optimization of the 8.800 m long Bossler Tunnel for the Highspeed Railway Line Stuttgart - Ulm
World Tunnel Congress (WTC) 2017
Surface challenges - Underground solutions
2017
Besondere Fragestellungen und Innovationen im Tunnelbau am Beispiel des Boßlertunnels / Albaufstieg (NBS Wendlingen – Ulm)
57-68
5. Münchener Tunnelbausymposium
2016
About the design of new or the recalculation of existing inner linings of tunnels taking into account the non-linear material behaviour of concrete
Fourth International fib Congress 2014: Improving Performance of Concrete Structures
2014
Fertigteile im Tunnelbau
235 - 302
BetonKalender 2014
Bergmeister, K.; Fingerloos, F.;
Ernst und Sohn
2014
Citytunnel Malmö E 201 – Besondere Bemessungsfragen, Beispiel Brandschutz
Münchner Massivbau Seminar 2010
2010
Der Citytunnel Malmö Los E 201 - Ein gemeinsamer Erfolg von Bauherr, Auftragnehmer und Planern
Jahrbuch 2009 Bautechnik
VDI Verlag
2008
Mobilitätszentren – Innerstädtische Bahnhofsbau-werke
11-170
Beton-Kalender 2012
Bergmeister, K.; Fingerloos, F.; Wörner, J.-D.
Ernst & Sohn
2012
Unbewehrte Innenschalen im Tunnelbau – Anwendung, Bemessungsfragen und Erfahrungen aus dem In- und Ausland
Tagungsunterlagen zum VfSVI-Seminar „Konstruktiver Ingenieurbau“
2012