Untersuchung zur Nivellierung der Vorgangsdauern in einer Taktplanung im Schlüsselfertigbau
Abstract:
In this work, a study on the leveling of process durations in a takt planning in turnkey construction was carried out. By introducing the method of takt planning and takt control from Lean Construction into the production process, the productivity of a construction project can be increased. However, the detailed scheduling and the strict flow of the takt leads to a low flexibility in the construction process and thus to a higher vulnerability to disturbances. In practice, this often results in s...     »
Keywords:
Taktplanung, Taktsteuerung, Ausbaugewerke, Störungen, Vorgangsdauern, Schlüsselfertigbau, Geschosswohnungsbau, Störanfälligkeiten, Monte-Carlo-Simulation, Verschwendungen, Sensitivitätsanalyse
Advisor:
Deininger, Isabella
Year:
2023
Language:
de
University:
Technische Universität München
Faculty:
TUM School of Engineering and Design
TUM Institution:
Lehrstuhl für Bauprozessmanagement
Status:
Abgeschlossen
 BibTeX