Benutzer: Gast  Login
Titel:

Preparator 2.0

Autor(en):
Fatemeh Fakharian, Philipp Schneider
Betreuer:
Gergő Dori, Simon Daum
Abstract:
This project was performed to bring production steps to economic order. Production chains can be set to discrete event structure to be able to apply optimization tools.
Jahr:
2012
 BibTeX