Benutzer: Gast  Login
Titel:

Bridge Construction Schedule Generation with Pattern-based Construction Models and Constraint-based Simulation

Autor(en):
Wu, I-C.; Borrmann, A.; Beissert, U.; König, M.; Rank, E.
Abstract:
This paper presents a novel methodology which assists in automating the generation of time schedules for bridge construction projects. The method is based on a simulation of construction works, taking into account the available resources and the interdependencies between individual tasks. The simulation is realized by means of a discrete-event simulation software originally created for plant layout in the manufacturing industry. Due to the fact that the fixed process chains provided are too rigi...     »
Zeitschriftentitel:
Advanced Engineering Informatics
Jahr:
2010
Band / Volume:
24
Heft / Issue:
4
Seitenangaben Beitrag:
379-388
 BibTeX