Benutzer: Gast  Login
Sortieren nach:
und:
Mehr ...

Sachs, Florian E.;Kiesmüller, Gudrun P.;Helber, Stefan
Design of unreliable flow lines: How to jointly allocate buffer space and spare parts
IISE Transactions
2024
1-26

Mehr ...

Pham, Dai T.;Kiesmüller, Gudrun P.
Hybrid Value Function Approximation for Solving the Technician Routing Problem with Stochastic Repair Requests
Transportation Science
2024

Mehr ...

Sachs, F.E.;Helber, S.;Kiesmüller, G.P.
Evaluation of Unreliable Flow Lines with Limited Buffer Capacities and Spare Part Provisioning
European Journal of Operational Research
2022
302
2
544-559

Mehr ...

Ralfs, Jana;Kiesmüller, Gudrun P.
Inventory management with advance demand information and flexible shipment consolidation
OR Spectrum
2022
44
4
1009-1044

Mehr ...

Pham, Dai T.;Kiesmüller, Gudrun P.
Multiperiod integrated spare parts and tour planning for on-site maintenance activities with stochastic repair requests
Computers & Operations Research
2022
148
105967

Mehr ...

Rippe, Christoph;Kiesmüller, Gudrun P.
The repair kit problem with imperfect advance demand information
European Journal of Operational Research
2023
304
2
558-576

Mehr ...

Rippe, Christoph;Kiesmüller, Gudrun P.
The added value of advance demand information for the planning of a repair kit
Central European Journal of Operations Research
2022
31
1
311-335

Mehr ...

Sonntag, Danja R.;Schrotenboer, Albert H.;Kiesmüller, Gudrun P.
Stochastic inventory routing with time-based shipment consolidation
European Journal of Operational Research
2023
306
3
1186-1201

Mehr ...

Kiesmüller, G.P.;Sachs, F.E.
Spare parts or buffer? How to design a transfer line with unreliable machines
European Journal of Operational Research
2020
121-134

Mehr ...

S. D. P. Flapper, G. P. Kiesmüller
Technisch beperkt bruikbare distributiehulpmiddelen
Handboek Reverse Logistics
Alphen a/d Rijn
1999