User: Guest  Login
Document type:
Konferenzbeitrag 
Contribution type:
Textbeitrag / Aufsatz 
Author(s):
Kepa Iturralde, Thomas Linner, Thomas Bock 
Title:
First monitoring and analysis of the manufacturing and installation process of timber based 2D modules for accomplishing a future robotic building envelope upgrading 
Pages contribution:
65-73 
Abstract:
The BERTIM Research Project is funded by the European Commission in order to develop a system for an efficient building envelope upgrading. The main goal of this envelope upgrading consists on adding a new 2D or 3D module onto the building external layer. The modules are made out of timber, thermal insulation and waterproof layers. These modules can also host some functionalities. In a previous phase, a method for implementing an efficient, integrated, modular and customized manufacturing and in...    »
 
Keywords:
refurbishing, customization, automated, prefabrication, Axiomatic Design, TRIZ 
Horizon 2020:
636984 
Editor:
International Association for Automation and Robotics in Construction (IAARC) 
Book / Congress title:
Proceedings of the 34rd ISARC (International Symposium on Automation and Robotics in Construction) 
Date of congress:
28.06 - 01.07.2017 
Year:
2017 
Pages:
1106 
E-ISBN:
978-80-263-1371-7 
Reviewed:
ja 
Language:
en 
Publication format:
WWW 
TUM Institution:
Lehrstuhl für Baurealisierung und Baurobotik 
Format:
Text